Sub slab Suction Point
This was the suction point of the basement slab. It is connected on one side to the crawlspace and the other side through the joist and up through the floor in the mechanical room.
Mechanical room
As radon riser comes up through the floor (from basement) it proceeds up into the attic where it is combined with the new addition suction point riser (not pictured).